KITCHEN UPGRADE

As with many of our kitchen design requests today, this homeowner desires to change from dark, stained, builder grade cabinets to brighter, painted, custom cabinets.  In this particular case, we are going for light gray cabinets and a darker gray island color, with granite counter-tops having a white background. The wood floor will be installed throughout the entire first floor of the home.

 

We have repositioned the pantry to be contained within the cabinetry instead of being located in a closet situation. Additionally, in order to create a solid and completely functional work triangle, the sink is also being repositioned (to the island), and the cook-top changes places as well.  The large island offers great storage, is an excellent prep space (with pull out trash drawer), or can provide additional seating.

 

This homeowner has a very hectic schedule and will be relying on our selections services to finalize the choices of granite, paint, back-splash, faucets, hardware, etc.  A project of this scope typically takes approx.. 6-7 weeks from start to completion.

Flower Mound, TX Residence

- by  John Voigt

KITCHEN UPGRADE

We've cleared away an outdated kitchen layout and turned it into a modern marvel.

BACK

SCHEDULE YOUR CONSULTATION

 

Fill out the form below and we will contact you shortly!

Submitting Form...

The server encountered an error.

Form received.

<

214.651.4185

© 2017 Copyright Tribute Kitchen & Bath

TKB